At Novatex Pvt Ltd, we successfully executed panel modifications, conducted comprehensive testing of CTs, PTs, and relays, and verified the protection loop using a Three-Phase Variac. Additionally, we established a ring loop connection to enhance system redundancy. All tests confirmed accurate measurements, proper relay functionality, and loop integrity, ensuring a reliable and safe electrical protection system. Detailed documentation was maintained for future reference.